INTRODUCTION, IMPORTANCE & DEFINITION
RELIABILITY IS AN ENGINEERING DISCIPLINE FOR APPLYING SCIENTIFIC KNOW-HOW TO A COMPONENT, ASSEMBLY, PLANT, OR PROCESS SO IT WILL PERFORM ITS INTENDED FUNCTION, WITHOUT FAILURE, FOR THE REQUIRED TIME DURATION WHEN INSTALLED AND OPERATED CORRECTLY IN A SPECIFIED ENVIRONMENT.

RELIABILITY IS "QUALITY CHANGING OVER TIME" OR A MOTION PICTURE INSTEAD OF A SNAPSHOT.

RELIABILITY IS A MEASURE OF THE RESULT OF THE QUALITY OF THE PRODUCT OVER THE LONG RUN. RELIABILITY TERMINATES WITH A FAILURE—I.E, UNRELIABILITY OCCURS. BUSINESS ENTERPRISES OBSERVE THE HIGH COST OF UNRELIABILITY. THE HIGH COST OF UNRELIABILITY MOTIVATES AN ENGINEERING SOLUTION TO CONTROL AND REDUCE COSTS.
MIL-STD-721C DEFINITIONS OF TERMS FOR RELIABILITY AND MAINTAINABILITY GIVES THE FOLLOWING DEFINITION FOR RELIABILITY:

RELIABILITY IS THE PROBABILITY THAN AN ITEM CAN PERFORM ITS INTENDED FUNCTION WITHOUT FAILURE FOR A SPECIFIED INTERVAL UNDER STATED CONDITIONS.

THIS DEFINITION PROVIDES THE FOLLOWING FOUR ASPECTS OF RELIABILITY:
  1. RELIABILITY IS A PROBABILITY BASED CONCEPT; THE NUMERICAL VALUE OF THE RELIABILITY IS BETWEEN 0 AND 1
  2. THE FUNCTIONAL PERFORMANCE OF THE PRODUCT HAS TO MEET CERTAIN STIPULATIONS AND A FUNCTIONAL DEFINITION OF FAILURE IS NEEDED. FOR EXAMPLE, A FAILURE MEANS DIFFERENT THINGS TO THE USER AND TO THE REPAIR PERSON.
  3. IT IMPLIES SUCCESSFUL OPERATION OVER A CERTAIN PERIOD OF TIME
  4. OPERATING OR ENVIRONMENTAL CONDITIONS UNDER WHICH PRODUCT USE TAKES PLACE ARE SPECIFIED
COST OF UNRELIABILITY
COST IMPROVEMENT EFFORTS ARE MORE PRODUCTIVE WHEN MOTIVATED FROM THE TOP-DOWN RATHER THAN BOTTOM-UP BECAUSE IT IS A TOP MANAGEMENT DRIVEN EFFORT FOR IMPROVING COSTS. FINDING THE COST OF UNRELIABILITY (COUR) STARTS WITH A BIG-PICTURE VIEW AND HELPS DIRECT COST IMPROVEMENT PROGRAMS BY IDENTIFYING:
  1. WHERE IS THE COST PROBLEM--WHAT SECTIONS OF THE PLANT,
  2. WHAT MAGNITUDE IS THE PROBLEM--ALL BUSINESS LOSS COSTS ARE INCLUDED IN THE CALCULATION, AND
  3. WHAT MAJOR TYPES OF PROBLEMS OCCUR
COST OF UNRELIABILITY PROGRAMS STUDY PLANTS AS LINKS IN A CHAIN FOR A RELIABILITY SYSTEM, AND THE COSTS INCURRED WHEN THE PLANT, OR A SERIES OF PLANTS, FAIL TO PRODUCE THE DESIRED RESULT.
COST OF UNRELIABILITY BEGINS WITH THE BIG PICTURE OF FAILURES TO PRODUCE THE DESIRED BUSINESS RESULTS DRIVEN BY FAILURES OF THE PROCESS OR IT'S EQUIPMENT. ELEMENTS OF THE PROCESS ARE CONSIDERED AS A SERIES RELIABILITY MODEL COMPRISING LINKS IN A CHAIN OF EVENTS THAT DELIVER SUCCESS OR FAILURE. LOGICAL BLOCK DIAGRAMS OF MAJOR STEPS OR SYSTEMS ARE IDENTIFIED. FAILURE COSTS ARE CALCULATED BY CATEGORY EXPECTING THAT HISTORY TENDS TO REPEAT IN A STRING OF CHANCE EVENTS UNLESS THE PROBLEMS HAVE BEEN PERMANENTLY REMOVED AND SUCCESS DEMONSTRATED BY OBJECTIVE MEASURES.  

DESIGNING FOR RELIABILITY
RELIABILITY DOES NOT JUST HAPPEN. IT REQUIRES THAT THE FOLLOWING THREE KEY ELEMENTS BE IN PLACE
  1. A COMMITMENT FROM TOP MANAGEMENT TO ENSURING RELIABILITY
  2. A RELIABILITY POLICY (THAT GOES HAND-IN-HAND WITH A QUALITY POLICY)
  3. A PHILOSOPHY THAT DESIGNS RELIABILITY IN AT AN EARLY STAGE
  WAYS TO IMPROVE RELIABILITY
  • USE PROVEN DESIGNS
  • USE THE SIMPLEST POSSIBLE DESIGNS
  • USE PROVEN COMPONENTS THAT HAVE UNDERGONE RELIABILITY COMPONENT TESTING
  • USE REDUNDANT PARTS IN HIGH RISK AREAS. PLACING TWO COMPONENTS IN PARALLEL WILL REDUCE THE OVERALL PROBABILITY OF FAILURE
  • ALWAYS DESIGN FAIL SAFE
  • SPECIFY AND USE PROVEN MANUFACTURING METHODS
MEASURES OF RELIABILITY
RELIABILITY IS THE PROBABILITY THAT A SYSTEM WILL STILL BE FUNCTIONING AT TIME T. 

THIS CAN BE EXPRESSED AS “THE CUMULATIVE DISTRIBUTION OF FAILURE”

THESE TWO MEASURES ARE THE MIRROR IMAGE OF EACH OTHER (REFER FIGURE BELOW). THE RELIABILITY WILL START AT 1 AND DECAY TO APPROACH 0 OVER TIME. THE CUMULATIVE DISTRIBUTION OF FAILURE WILL START AT 0 (NO FAILURES) AND APPROACH 1 AS ALL THE ITEMS FAIL OVER TIME. THE SLOPE OF THE RELIABILITY CURVE AT ANY TIME T IS THE FAILURE RATE AT THAT POINT IN TIME. THESE MEASURES GIVE THE OVERALL RELIABILITY OR FAILURE AT TIME T.

PROBABILITY DENSITY FUNCTION

WE WISH TO HAVE AN IDEA OF THE PROBABILITY OF AN ITEM FAILING IN A GIVEN UNIT TIME PERIOD. THIS IS TERMED THE “PROBABILITY DENSITY FUNCTION” AND IS GIVEN BY

THE FAILURE OR HAZARD RATE GIVES THE FAILURE DENSITY OVER A PERIOD OF TIME AS WITH THE “PROBABILITY DENSITY FUNCTION”, BUT IS BASED ON THE CURRENT POPULATION. THIS GIVES A MUCH BETTER INDICATION OF THE CHANGING RELIABILITY OF A SYSTEM OVER TIME.



REFERENCES:-  www.nptel.iitm.ac.in/



Comments

  1. This is very good information.i think it's useful advice. really nice blog. keep it up!!!

    reliability engineering jobs

    ReplyDelete

Post a Comment

Popular posts from this blog

APRON MECHANISM IN LATHE

APRON MECHANISM IN LATHE Apron Mechanism: Apron is attached to the carriage and hangs over the front side of the lathe bed. It is useful in providing power and hand feed to both carriage and cross-slide. It is also used to provide power feed to the carriage during thread cutting through two half nuts. The construction of apron is shown in Fig. Fig - Apron Mechanism Construction Power is transmitted from the spindle to the lead screw and feed rod through the spindle gear and tumbler gear arrangement. A worm is mounted on the feed rod by a sliding key. The worm meshes with a worm gear on whose axis another gear G1 is attached. Gear G1 is attached to a small gear G2 by a bracket as shown in the diagram. Gear G4 is positioned to be in mesh with the rack gear always. Another gear G3 is mounted on the same axis of gear G4. The carriage hand wheel meant for longitudinal feed is attached to the gear G5 on the same axis. The gears G3 and G5 are always in mesh. The gear G

Boiler Mountings - Dead Weight Safety Valve

DEAD WEIGHT SAFETY VALVE Function:- A valve is placed upon a valve seat that is fixed upon a long vertical pipe having a flange at the bottom for fixing at the top of the boiler. Suspended at the top of the valve is the weight carrier that carries cast iron rings. The total weight must be sufficient to keep the valve on its seat against the normal working pressure. When the steam pressure exceeds the normal limit, it lifts the valve with its weight & the excess steam escape through the pipe to the outside. This valve is used only with stationary type of boilers. It is the most elementary type of safety valve. The objection to dead weight safety valve is the heavy weight that has to be carried. Image - Dead Weight Safety Valve Figure - Dead Weight Safety Valve

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 1.60 3.0 1.80 4.0 2.00 5.0 2.20 6.0 MOTOR  CALIBRATION  CHART THEORY : WHENEVER THE DISTANCE BETWEEN THE DRIVING AND DRIVEN MEMBER, (BOTH SHAFTS ARE NOT OPERATING ON THE SAME A