Skip to main content

Production Planning And Control

 PPC - PRODUCTION, PLANNING AND CONTROL

INTRODUCTION
PRODUCTION PLANNING IS A MANAGERIAL FUNCTION WHICH IS MAINLY CONCERNED WITH THE FOLLOWING IMPORTANT ISSUES:
  • WHAT PRODUCTION FACILITIES ARE REQUIRED?
  • HOW THESE PRODUCTION FACILITIES SHOULD BE LAID DOWN IN THE SPACE AVAILABLE FOR PRODUCTION? AND
  • HOW THEY SHOULD BE USED TO PRODUCE THE DESIRED PRODUCTS AT THE DESIRED RATE OF PRODUCTION?
BROADLY SPEAKING, PRODUCTION PLANNING IS CONCERNED WITH TWO MAIN ASPECTS: (I) ROUTING OR PLANNING WORK TASKS (II) LAYOUT OR SPATIAL RELATIONSHIP BETWEEN THE RESOURCES. PRODUCTION PLANNING IS DYNAMIC IN NATURE AND ALWAYS REMAINS IN FLUID STATE AS PLANS MAY HAVE TO BE CHANGED ACCORDING TO THE CHANGES IN CIRCUMSTANCES.
PRODUCTION CONTROL IS A MECHANISM TO MONITOR THE EXECUTION OF THE PLANS. IT HAS SEVERAL IMPORTANT FUNCTIONS:
  • MAKING SURE THAT PRODUCTION OPERATIONS ARE STARTED AT PLANNED PLACES AND PLANNED TIMES.
  • OBSERVING PROGRESS OF THE OPERATIONS AND RECORDING IT PROPERLY.
  • ANALYZING THE RECORDED DATA WITH THE PLANS AND MEASURING THE DEVIATIONS.
  • TAKING IMMEDIATE CORRECTIVE ACTIONS TO MINIMIZE THE NEGATIVE IMPACT OF DEVIATIONS FROM THE PLANS.
  • FEEDING BACK THE RECORDED INFORMATION TO THE PLANNING SECTION IN ORDER TO IMPROVE FUTURE PLANS.
TABLE 1: PRODUCTION PLANNING AND CONTROL FUNCTIONS
FUNCTIONS
ISSUES TO BE COVERED
PRODUCT DESIGN& DEVELOPMENT
CUSTOMER NEEDS, MARKET NEEDS, AVAILABILITY OF SIMILAR PRODUCT, DEMAND-SUPPLY GAP, FUNCTIONAL ASPECTS, OPERATIONAL ASPECTS, ENVIRONMENTAL ASPECTS ETC.
DEMAND FORECASTING
QUANTITY, QUALITY, DEMAND PATTERN.                                                                                                                                                      
CAPACITY PLANNING
NO. OF MACHINES, NO. OF TOOLING, WORKERS, NO.OF FLOW LINES, QUANTITY, QUALITY AND RATE OF PRODUCTION, DEMAND PATTERN.         
EQUIPMENTS SELECTION & MAINTENANCE
NO. OF MACHINES, TYPE OF M/C, QUALITY ASPECTS, QUANTITY ASPECTS, RATE OF PRODUCTION, COST OF EQUIPMENTS, SUPPORT FROM THE SUPPLIER, MAINTENANCE POLICY, AND STORAGE OF SPARE PARTS.
TOOLING SELECTION
COMPACTABILITY BETWEEN W/C STEELS, NO. OF TOOLS, THEIR COST, THEIR MATERIAL ETC, STORAGE POLICY.                                               
MATERIAL SELECTION & MANAGEMENT
TYPES, SPECIFICATION, QUALITY ASPECT, QUANTITY ASPECT, COST, SUPPLIES REPUTATION , LOT SIZE, INVENTORY LEVELS, SETUP COST, MODE OF TRANSPORTATION ETC.
PROCESS PLANNING
GENERATION OF MANUFACTURE INSTRUCTION, SELECTION OF M/C, TOOLS, PARAMETERS, SEQUENCE ETC.                                                  
LOADING
DIVISION OF WORK LOAD, ASSIGNMENT OF TASKS, UNIFORM LOADING, MATCHING BETWEEN CAPABILITY & CAPACITY WITH JOB REQUIREMENTS.  
ROUTING
PATH SELECTION FOR MATERIAL MOVEMENT AS PER THE PROCESS PLAN AND LOADING, MINIMUM MATERIAL HANDLING AND WAITING TIME.
SCHEDULING
TIME BASED LOADING, START AND FINISH TIMES, DUE DATES, DISPATCHING RULES, RE-SCHEDULING.
EXPEDITING
OPERATION SCHEDULING AND ORDER AND PROGRESS REPORTING.

TYPES OF PRODUCTION SYSTEMS
A PRODUCTION SYSTEM CAN BE DEFINED AS A TRANSFORMATION SYSTEM IN WHICH A SALEABLE PRODUCT OR SERVICE IS CREATED BY WORKING UPON A SET OF INPUTS. INPUTS ARE USUALLY IN THE FORM OF MEN, MACHINE, MONEY, MATERIALS ETC. PRODUCTION SYSTEMS ARE USUALLY CLASSIFIED ON THE BASIS OF THE FOLLOWING:
  • TYPE OF PRODUCT,
  • TYPE OF PRODUCTION LINE,
  • RATE OF PRODUCTION,
  • EQUIPMENTS USED ETC.
THEY ARE BROADLY CLASSIFIED INTO THREE CATEGORIES:
  • JOB SHOP PRODUCTION
  • BATCH PRODUCTION
  • MASS PRODUCTION 

JOB PRODUCTION
IN THIS SYSTEM PRODUCTS ARE MADE TO SATISFY A SPECIFIC ORDER. HOWEVER THAT ORDER MAY BE PRODUCED-
  • ONLY ONCE
  • OR AT IRREGULAR TIME INTERVALS AS AND WHEN NEW ORDER ARRIVES
  • OR AT REGULAR TIME INTERVALS TO SATISFY A CONTINUOUS DEMAND
THE FOLLOWING ARE THE IMPORTANT CHARACTERISTICS OF JOB SHOP TYPE PRODUCTION SYSTEM:
  • MACHINES AND METHODS EMPLOYED SHOULD BE GENERAL PURPOSE AS PRODUCT CHANGES ARE QUITE FREQUENT.
  • PLANNING AND CONTROL SYSTEM SHOULD BE FLEXIBLE ENOUGH TO DEAL WITH THE FREQUENT CHANGES IN PRODUCT REQUIREMENTS.
  • MAN POWER SHOULD BE SKILLED ENOUGH TO DEAL WITH CHANGING WORK CONDITIONS.
  • SCHEDULES ARE ACTUALLY NON EXISTENT IN THIS SYSTEM AS NO DEFINITE DATA IS AVAILABLE ON THE PRODUCT.
  • IN PROCESS INVENTORY WILL USUALLY BE HIGH AS ACCURATE PLANS AND SCHEDULES DO NOT EXIST.
  • PRODUCT COST IS NORMALLY HIGH BECAUSE OF HIGH MATERIAL AND LABOR COSTS.
  • GROUPING OF MACHINES IS DONE ON FUNCTIONAL BASIS (I.E. AS LATHE SECTION, MILLING SECTION ETC.)
  • THIS SYSTEM IS VERY FLEXIBLE AS MANAGEMENT HAS TO MANUFACTURE VARYING PRODUCT TYPES.
  • MATERIAL HANDLING SYSTEMS ARE ALSO FLEXIBLE TO MEET CHANGING PRODUCT REQUIREMENTS.
BATCH PRODUCTION
BATCH PRODUCTION IS THE MANUFACTURE OF A NUMBER OF IDENTICAL ARTICLES EITHER TO MEET A SPECIFIC ORDER OR TO MEET A CONTINUOUS DEMAND. BATCH CAN BE MANUFACTURED EITHER-
  • ONLY ONCE
  • OR REPEATEDLY AT IRREGULAR TIME INTERVALS AS AND WHEN DEMAND ARISE
  • OR REPEATEDLY AT REGULAR TIME INTERVALS TO SATISFY A CONTINUOUS DEMAND
THE FOLLOWING ARE THE IMPORTANT CHARACTERISTICS OF BATCH TYPE PRODUCTION SYSTEM:
  • AS FINAL PRODUCT IS SOMEWHAT STANDARD AND MANUFACTURED IN BATCHES, ECONOMY OF SCALE CAN BE AVAILED TO SOME EXTENT.
  • MACHINES ARE GROUPED ON FUNCTIONAL BASIS SIMILAR TO THE JOB SHOP MANUFACTURING.
  • SEMI AUTOMATIC, SPECIAL PURPOSE AUTOMATIC MACHINES ARE GENERALLY USED TO TAKE ADVANTAGE OF THE SIMILARITY AMONG THE PRODUCTS.
  • LABOR SHOULD BE SKILLED ENOUGH TO WORK UPON DIFFERENT PRODUCT BATCHES.
  • IN PROCESS INVENTORY IS USUALLY HIGH OWING TO THE TYPE OF LAYOUT AND MATERIAL HANDLING POLICIES ADOPTED.
  • SEMI AUTOMATIC MATERIAL HANDLING SYSTEMS ARE MOST APPROPRIATE IN CONJUNCTION WITH THE SEMI AUTOMATIC MACHINES.
  • NORMALLY PRODUCTION PLANNING AND CONTROL IS DIFFICULT DUE TO THE ODD SIZE AND NON REPETITIVE NATURE OF ORDER.

MASS PRODUCTION
IN MASS PRODUCTION, SAME TYPE OF PRODUCT IS MANUFACTURED TO MEET THE CONTINUOUS DEMAND OF THE PRODUCT. USUALLY DEMAND OF THE PRODUCT IS VERY HIGH AND MARKET IS GOING TO SUSTAIN SAME DEMAND FOR SUFFICIENTLY LONG TIME.
THE FOLLOWING ARE THE IMPORTANT CHARACTERISTICS OF MASS PRODUCTION SYSTEM:
  • AS SAME PRODUCT IS MANUFACTURED FOR SUFFICIENTLY LONG TIME, MACHINES CAN BE LAID DOWN IN ORDER OF PROCESSING SEQUENCE. PRODUCT TYPE LAYOUT IS MOST APPROPRIATE FOR MASS PRODUCTION SYSTEM.
  • STANDARD METHODS AND MACHINES ARE USED DURING PART MANUFACTURE.
  • MOST OF THE EQUIPMENT ARE SEMI AUTOMATIC OR AUTOMATIC IN NATURE.
  • MATERIAL HANDLING IS ALSO AUTOMATIC (SUCH AS CONVEYORS).
  • SEMI SKILLED WORKERS ARE NORMALLY EMPLOYED AS MOST OF THE FACILITIES ARE AUTOMATIC.
  • AS PRODUCT FLOWS ALONG A PRE DEFINED LINE, PLANNING AND CONTROL OF THE SYSTEM IS MUCH EASIER.
  • COST OF PRODUCTION IS LOW OWING TO THE HIGH RATE OF PRODUCTION.
  • IN PROCESS INVENTORIES ARE LOW AS PRODUCTION SCHEDULING IS SIMPLE AND CAN BE IMPLEMENTED WITH EASE.

REFERENCES: - www.nptel.iitm.ac.in


Comments

  1. I read lot of articles and really like this article. This information is definitely useful for everyone in daily life. Fantastic job.

    B Tech in quality management
    Part time B.tech in program
    B.Tech in Industrial Engineering

    ReplyDelete

Post a Comment

Popular posts from this blog

APRON MECHANISM IN LATHE

APRON MECHANISM IN LATHE Apron Mechanism: Apron is attached to the carriage and hangs over the front side of the lathe bed. It is useful in providing power and hand feed to both carriage and cross-slide. It is also used to provide power feed to the carriage during thread cutting through two half nuts. The construction of apron is shown in Fig. Fig - Apron Mechanism Construction Power is transmitted from the spindle to the lead screw and feed rod through the spindle gear and tumbler gear arrangement. A worm is mounted on the feed rod by a sliding key. The worm meshes with a worm gear on whose axis another gear G1 is attached. Gear G1 is attached to a small gear G2 by a bracket as shown in the diagram. Gear G4 is positioned to be in mesh with the rack gear always. Another gear G3 is mounted on the same axis of gear G4. The carriage hand wheel meant for longitudinal feed is attached to the gear G5 on the same axis. The gears G3 and G5 are always in mesh. The gear G

Boiler Mountings - Dead Weight Safety Valve

DEAD WEIGHT SAFETY VALVE Function:- A valve is placed upon a valve seat that is fixed upon a long vertical pipe having a flange at the bottom for fixing at the top of the boiler. Suspended at the top of the valve is the weight carrier that carries cast iron rings. The total weight must be sufficient to keep the valve on its seat against the normal working pressure. When the steam pressure exceeds the normal limit, it lifts the valve with its weight & the excess steam escape through the pipe to the outside. This valve is used only with stationary type of boilers. It is the most elementary type of safety valve. The objection to dead weight safety valve is the heavy weight that has to be carried. Image - Dead Weight Safety Valve Figure - Dead Weight Safety Valve

DOM MANUAL / B-TECH / MECHANICAL / KUK - TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN.

OBJECTIVE: TO FIND THE SPEED AND TORQUE OF DIFFERENT GEARS IN AN EPICYCLIC GEAR TRAIN. SPECIFICATIONS : 1.       GEAR TRAIN : SUN GEAR : 14 TEETH 2.       PLANT GEAR: 21 TEETH (2 NOS.) 3.       INTERNAL GEAR WITH : 56 TEETH TORQUE MEASUREMENT ·          INPUT TORQUE – MOTOR CURRENT CALIBRATED FOR MOTOR TORQUE. ·          PLANT CARRIER - PULLEY OF 50 MM DIA AND SPRING BALANCE. ·          INTERNAL GEAR - PULLEY, 120 MM DIA AND SPRING BALANCES. Ø   BOTH PULLEYS ARE PROVIDED WITH ROPE OF 12 Ø   MM DIA Ø   DRIVE MOTOR - 1HP DC MOTOR RPM MOTOR OPERATING ON 220 VOLTS Ø   50 HZ SUPLLY, DRIVING THE SUN GEAR. CURRENT(AMPS) TORQUE 1.00 0.5 1.20 1.5 1.40 2.5 1.60 3.0 1.80 4.0 2.00 5.0 2.20 6.0 MOTOR  CALIBRATION  CHART THEORY : WHENEVER THE DISTANCE BETWEEN THE DRIVING AND DRIVEN MEMBER, (BOTH SHAFTS ARE NOT OPERATING ON THE SAME A